This test plan covers maintenance manual regression. It covers basic functionality for the following features.
- PTP (Precision Time Protocol)
- Port fail management and/or OAM
- Collectd + InfluxDb - RMON Replacement (ALL METRICS)
Overall Requirements
Any TIS system can be used.
Test Cases
MTC_PTP_1
- Test ID
-
MTC_PTP_1
- Test Title
-
test_configure_PTP_Service_using_GUI
- Tags
-
P1 MTC, PTP, regression
Testcase Objective
Purpose of this test is to validate configuration of PTP from GUI and verify alarm cleared.
Test Pre-Conditions
Test Steps
- Launch horizon and login as admin
- Open System Configuration page in horizon
- Click PTP and edit.
- Check mark to enabled
- Save verify out of configuration 250.001
- Lock and unlock all the nodes starting with standby controller.
- After all the nodes are bring locked and unlock and they are up.
- Verify Configuration out-of-date alarms are cleared for both controllers.
Expected Behavior
Able to edit the PTP from horizon GUI.
MTC_PTP_2
- Test ID
-
MTC_PTP_2
- Test Title
-
test_PTP_service_clock_sync_with_time_change_and_reboot_host
- Tags
-
P1 MTC, PTP, regression
Testcase Objective
To verify PTP service clock sync with reboot.
Test Pre-Conditions
Ensure all the hosts ether-net hardware is supported for software or hardware mode transmit and receive time stamp. E.g: Below show software mode supported ether-net:
ethtool -T <Interface> Time stamping parameters for enp134s0f0: Capabilities: software-transmit (SOF_TIMESTAMPING_TX_SOFTWARE) software-receive (SOF_TIMESTAMPING_RX_SOFTWARE) software-system-clock (SOF_TIMESTAMPING_SOFTWARE) PTP Hardware Clock: none Hardware Transmit Timestamp Modes: none Hardware Receive Filter Modes: none
Test Steps
Enabled PTP using following command:
system ptp-modify --enabled=True --mode=software
Lock and unlock all the hosts starting with standby controller to clear alarm Configuration out-of-date alarm id 250.001
Verify the time all sync after lock and unlock
Change time Eg: date +%T -s "11:14:00" in one of the host
Reboot the hosts where time is change and verify time is sync with other hosts after reboot.
Expected Behaviour
Time was sync after reboot.
MTC_PTP_3
- Test ID
-
MTC_PTP_3
- Test Title
-
test_ptp4l_process_failure_detection_by_alarm_200.006_and_recovery
- Tags
-
P1 MTC, PTP, regression
Testcase Objective
This test is to verify phc2sys process failure detection by alarm and alarm clear on recovery.
Test Pre-Conditions
Enable PTP as per instruction- - in Test case 1 or 2
Test Steps
- Find the process id for phc2sys
- Use the above process id and kill the process sudo kill -9 process ID
- Verify alarm and process restart
- Try steps 1 and 2 to verify multiple times
Expected Behavior
Process restart on process kill and alarm
MTC_PTP_4
- Test ID
-
MTC_PTP_4
- Test Title
-
test_ptp4l_process_failure_detection_alarm_200.006_and_recovery
- Tags
-
P1 MTC, PTP, Regression
Testcase Objective
- This test is to verify ptp4l process failure detection by alarm and alarm clear
-
on recovery.
Test Pre-Conditions
Enable PTP as per instruction in Test case 1 or 2
Test Steps
- Find the process id for ptp4l.
- Use the above process id and kill the process sudo kill -9 process ID
- Verify alarm and process restart.
- Try steps 1 and 2 to verify multiple times.
Expected Behavior
Process restart on process kill and alarm.
MTC_MgtOAMdown_5
- Test ID
-
MTC_MgtOAMdown_5
- Test Title
-
test_pull_management_cable_on_active_controller
- Tags
-
P1 MTC, regression
Testcase Objective
This test is to verify management cable pull on active controller and verify standby controller becoming active with host-list available on all the hosts except the other controller.
Test Pre-Conditions
Install 2+2 system.
Test Steps
- Remove management cable from active controller(controller-0)
- Verify alarm for communication failure
- Verify swact to controller-1
Expected Behaviour
Controller swact and alarm for communication failure.
MTC_MgtOAMdown_6
- Test ID
-
MTC_MgtOAMdown_6
- Test Title
-
test_that_compute_host_will_reboot_if_management_network_is_down
- Tags
-
P1 MTC, regression
Testcase Objective
This test is to verify that management cable pull on compute node alarm generated for communication failure.
Test Pre-Conditions
Install 2+2 system.
Test Steps
- Remove management cable from compute node.
- Verify alarm for communication failure.
- Verify compute reboot once cable is put back.
Expected Behavior
Alarm for communication failure and reboot
MTC_collectdIusflexDbRmon_7
- Test ID
-
MTC_collectdIusflexDbRmon_7
- Test Title
-
test_ntp_connectivity_failure_alarm_and_sample_data
- Tags
-
P1 MTC, regression
Testcase Objective
To verify NTP connection failure alarm and sample data.
Test Pre-Conditions
Install 2+2 system.
Test Steps
Verify no alarms on NTP.
Verify sample data for NTP value should be 3 or 2 for NTP connection is good and no alarms.
Execute below cli retrieve database info
while true; do influx -database=collectd -execute="SELECT * FROM ntpq_value ORDER by time DESC LIMIT 4"; sleep 31; done
When there is no failure above sample data will showed NTP connection failure is 1
Trigger a failure by update NTP server address in system configuration in horizon to unknown.
- Verify fm alarm list for NTP alarm for text server configuration doesn't
-
have reachable NTP server.
Query on database using below command. NTP connection failure will be indicated by 0
while true; do influx -database=collectd -execute="SELECT * FROM ntpq_value ORDER by time DESC LIMIT 4"; sleep 31; done
Expected Behavior
Alarm for communication failure and reboot.
References
https://wiki.openstack.org/wiki/StarlingX/Containers/Installation