This test plan covers maintenance manual regression. It covers basic functionality for the following features.

  • PTP (Precision Time Protocol)
  • Port fail management and/or OAM
  • Collectd + InfluxDb - RMON Replacement (ALL METRICS)

Overall Requirements

Any TIS system can be used.

Test Cases

MTC_PTP_1

Test ID

MTC_PTP_1

Test Title

test_configure_PTP_Service_using_GUI

Tags

P1 MTC, PTP, regression

Testcase Objective

Purpose of this test is to validate configuration of PTP from GUI and verify alarm cleared.

Test Pre-Conditions

Test Steps

  1. Launch horizon and login as admin
  2. Open System Configuration page in horizon
  3. Click PTP and edit.
  4. Check mark to enabled
  5. Save verify out of configuration 250.001
  6. Lock and unlock all the nodes starting with standby controller.
  7. After all the nodes are bring locked and unlock and they are up.
  8. Verify Configuration out-of-date alarms are cleared for both controllers.

Expected Behavior

Able to edit the PTP from horizon GUI.

MTC_PTP_2

Test ID

MTC_PTP_2

Test Title

test_PTP_service_clock_sync_with_time_change_and_reboot_host

Tags

P1 MTC, PTP, regression

Testcase Objective

To verify PTP service clock sync with reboot.

Test Pre-Conditions

Ensure all the hosts ether-net hardware is supported for software or hardware mode transmit and receive time stamp. E.g: Below show software mode supported ether-net:

ethtool -T <Interface>
Time stamping parameters for enp134s0f0:
Capabilities:
software-transmit     (SOF_TIMESTAMPING_TX_SOFTWARE)
software-receive      (SOF_TIMESTAMPING_RX_SOFTWARE)
software-system-clock (SOF_TIMESTAMPING_SOFTWARE)
PTP Hardware Clock: none
Hardware Transmit Timestamp Modes: none
Hardware Receive Filter Modes: none

Test Steps

  1. Enabled PTP using following command:

    system ptp-modify --enabled=True --mode=software
  2. Lock and unlock all the hosts starting with standby controller to clear alarm Configuration out-of-date alarm id 250.001

  3. Verify the time all sync after lock and unlock

  4. Change time Eg: date +%T -s "11:14:00" in one of the host

  5. Reboot the hosts where time is change and verify time is sync with other hosts after reboot.

Expected Behaviour

Time was sync after reboot.

MTC_PTP_3

Test ID

MTC_PTP_3

Test Title

test_ptp4l_process_failure_detection_by_alarm_200.006_and_recovery

Tags

P1 MTC, PTP, regression

Testcase Objective

This test is to verify phc2sys process failure detection by alarm and alarm clear on recovery.

Test Pre-Conditions

Enable PTP as per instruction- - in Test case 1 or 2

Test Steps

  1. Find the process id for phc2sys
  2. Use the above process id and kill the process sudo kill -9 process ID
  3. Verify alarm and process restart
  4. Try steps 1 and 2 to verify multiple times

Expected Behavior

Process restart on process kill and alarm

MTC_PTP_4

Test ID

MTC_PTP_4

Test Title

test_ptp4l_process_failure_detection_alarm_200.006_and_recovery

Tags

P1 MTC, PTP, Regression

Testcase Objective

This test is to verify ptp4l process failure detection by alarm and alarm clear

on recovery.

Test Pre-Conditions

Enable PTP as per instruction in Test case 1 or 2

Test Steps

  1. Find the process id for ptp4l.
  2. Use the above process id and kill the process sudo kill -9 process ID
  3. Verify alarm and process restart.
  4. Try steps 1 and 2 to verify multiple times.

Expected Behavior

Process restart on process kill and alarm.

MTC_MgtOAMdown_5

Test ID

MTC_MgtOAMdown_5

Test Title

test_pull_management_cable_on_active_controller

Tags

P1 MTC, regression

Testcase Objective

This test is to verify management cable pull on active controller and verify standby controller becoming active with host-list available on all the hosts except the other controller.

Test Pre-Conditions

Install 2+2 system.

Test Steps

  1. Remove management cable from active controller(controller-0)
  2. Verify alarm for communication failure
  3. Verify swact to controller-1

Expected Behaviour

Controller swact and alarm for communication failure.

MTC_MgtOAMdown_6

Test ID

MTC_MgtOAMdown_6

Test Title

test_that_compute_host_will_reboot_if_management_network_is_down

Tags

P1 MTC, regression

Testcase Objective

This test is to verify that management cable pull on compute node alarm generated for communication failure.

Test Pre-Conditions

Install 2+2 system.

Test Steps

  1. Remove management cable from compute node.
  2. Verify alarm for communication failure.
  3. Verify compute reboot once cable is put back.

Expected Behavior

Alarm for communication failure and reboot

MTC_collectdIusflexDbRmon_7

Test ID

MTC_collectdIusflexDbRmon_7

Test Title

test_ntp_connectivity_failure_alarm_and_sample_data

Tags

P1 MTC, regression

Testcase Objective

To verify NTP connection failure alarm and sample data.

Test Pre-Conditions

Install 2+2 system.

Test Steps

  1. Verify no alarms on NTP.

  2. Verify sample data for NTP value should be 3 or 2 for NTP connection is good and no alarms.

  3. Execute below cli retrieve database info

    while true; do  influx -database=collectd -execute="SELECT * FROM ntpq_value
    ORDER by time DESC LIMIT 4"; sleep 31; done
  4. When there is no failure above sample data will showed NTP connection failure is 1

  5. Trigger a failure by update NTP server address in system configuration in horizon to unknown.

  6. Verify fm alarm list for NTP alarm for text server configuration doesn't

    have reachable NTP server.

  7. Query on database using below command. NTP connection failure will be indicated by 0

    while true; do  influx -database=collectd -execute="SELECT * FROM
    ntpq_value ORDER by time DESC LIMIT 4"; sleep 31; done

Expected Behavior

Alarm for communication failure and reboot.

References

https://wiki.openstack.org/wiki/StarlingX/Containers/Installation